油气

From small in-air lifts of a few ton up to the largest subsea manifolds of more than 1000 ton, Cranemaster has the right units to remove slack slings, shock loads or unwanted motion. We provide lift analysis and have expertise and equipment for every phase of the lifting operation.

Typical applications where Cranemaster should be considered

  • Ship-to-ship lifting, reducing snap loads and/or avoid re-contact.
  • Splash zone crossing, reduce risk of slack slings and snap loads.
  • Subsea lowering, reduce risk of resonance.
  • Subsea landing phase, reduce landing velocity and motion.
  • Recovery of objects from the sea floor, provide controlled tension in the crane when object is getting loose.
  • Overload protection, use Cranemaster to protect valuable assets from excessive loads.

实例探究 – 油气

2018-09-24T05:21:43+01:00

Subsea 7 在恶劣天气下成功安装防护罩

客户挑战: 在恶劣天气中为 Subsea 7 在设得兰群岛水域安装 GRP 防护罩。 Cranemaster 解决方案: Cranemaster® 装置,SWL 为 50 公吨,伸缩量为 3 米。 详情: Cranemaster 在前期进行了分析,为 Subsea 7 预定高达 3 米海浪的天气范围。 Cranemaster® 装置同时被用于穿越溅水区和降低着陆速度。 [...]

2018-10-10T08:32:22+01:00

Jumbo 为 Ikhwezi 项目安装结构物

客户挑战: 为南非近海的 PetroSA Ikhwezi 项目部署五个海底结构物。 Cranemaster 解决方案: 两个 Cranemaster® 装置,SWL 为 250 公吨,伸缩量为 2.5 米。 详情: Jumbo 的 DP2 重吊船 Fairplayer 完成了五个结构物的安装,每个结构物重量在 35 至 185 公吨之间,最大尺寸为 [...]

2018-09-24T04:38:29+01:00

钢绞线千斤顶海浪补偿

客户挑战: 非洲西海岸 FPSO 外部转塔系泊结构物维护期间的运动补偿。 出于部分维护要求,需要更换一个转环。 更换转环时,使用了钢绞线千斤顶将结构物固定在一起。 Cranemaster 解决方案: 为了补偿 FPSO 起伏造成的炮塔运动, 使用了 Cranemaster® 被动型海浪补偿器作为钢绞线千斤顶的一部分。 详情: 使用 Cranemaster® 后流畅且平稳地完成了转环的更换,有助于保证维护的安全和成功。 图片显示了在更换转环时,被动型海浪补偿器 和钢绞线千斤顶的索具是如何承载转塔结构物。

更多参考

让我们帮助您找到适合您的项目的解决方案

联系我们