避免共振

The concept of resonance has got increased focus recently as weight and water depths are increasing. The problem may occur when the wave period of the surface waves, and thus the frequency of the heave, generate boom tip movements which correspond to the system frequency of the load and wire. The heave may then create resonance movements in the subsea load and wire with destructive energy.

Operational Challenges

  • When the wave period of the surface waves, and thus the frequency of the heave, generate boom tip movements which correspond to the system frequency of the load and wire.

  • The heave creates resonance movements in the subsea load and wire with destructive energy.

  • Crossing of structures with large variation between weight in water and air.

Cranemaster Benefits

  • Uncontrolled dynamic forces and escalating movements of load during deep water operations avoided.

  • With Cranemaster® included in the rigging, system resonance period will be increased.

Subsea resonance with and without Cranemaster

This Orcaflex simulation shows how resonance for deep water lowering can be avoided by use of Cranemaster.

System frequency

The system frequency is primarily dependent on the properties of the load and on the overall wire stiffness. Since the wire stiffness changes with length, and thus with water depth, the system frequency will also change with water depth. At deep water operation it is therefore high probability that at some point during the lowering operation the system frequency and wave period interfere to create resonance which may cause uncontrolled dynamic forces on the load and wire.

This example shows the system frequency/period (red line) for an object of 400 t (added mass 1000 t) lowered from the surface down to 2400 m with a typical setting on crane and wire stiffness. The average stiffness of the Cranemaster® is 200 kN/m. The system frequency without Cranemaster® scan periods that with high probability will match the wave induced movements during the lowering, and resonance with escalating movements and forces to load and crane may occur. When Cranemaster® is included in the rigging, the system frequency will be shifted upwards (blue line), avoiding the match with the wave induced frequencies.

Featured References – 避免共振

2018-10-10T08:32:22+01:00

Jumbo 为 Ikhwezi 项目安装结构物

客户挑战: 为南非近海的 PetroSA Ikhwezi 项目部署五个海底结构物。 Cranemaster 解决方案: 两个 Cranemaster® 装置,SWL 为 250 公吨,伸缩量为 2.5 米。 详情: Jumbo 的 DP2 重吊船 Fairplayer 完成了五个结构物的安装,每个结构物重量在 35 至 185 公吨之间,最大尺寸为 [...]

2018-09-24T08:22:18+01:00

在深水安装吸水桩

客户挑战: 为西非境外的 Boabab 3 期项目安装 50 公吨的吸水桩。 深水区域的作业对所使用的设备有很高的要求。 在深水使用被动型海浪补偿器的一个常见挑战就是深水压力将活塞推回,导致系统效率降低。 Cranemaster 解决方案: Cranemaster® 装置,SWL 为 75 公吨,伸缩量为 4 米。 该装置配备 Cranemaster® Passive Depth Compensation (CMDC),这是专为深水作业制造的坚固的系统。 伸缩量保持恒定,与深度无关,并且消除了降低时可能发生的共振。 详情: 在整个降低过程中,配备 [...]

2018-10-10T08:31:56+01:00

墨西哥湾的 Saipem 项目

客户挑战: 在墨西哥湾为 Saipem 安装大表面的结构物。 Cranemaster 解决方案: Cranemaster® 装置,SWL 为 50 公吨,伸缩量为 3 米。 详情: Cranemaster® 装置通过溅水区时成功地吸收了力, 避免了共振并降低了着陆速度。 使用 Cranemaster 对于获得合理的作业天气范围至关重要。 在作业之前,Cranemaster 进行了提升分析。

More references