Saipem project in the Gulf of Mexico

Customer Challenge:

Installation of structures with large surfaces for Saipem in the Gulf of Mexico.

Cranemaster Solution:

A Cranemaster unit with SWL of 50 metric tons and 3 meter stroke.

The Results:

The Cranemaster unit successfully absorbed the forces through the splash zone, avoided resonance and reduced landing speed.

The use of Cranemaster was essential to obtain a reasonable operational weather window. Lift analysis was conducted by Cranemaster prior to the operations.

Back to all references