Project Description

Customer Challenge:

Cross haul and landing of 167 metric tons piles, manifolds and pump stations for TechnipFMC USA.

Cranemaster Solution:

Two Cranemaster® units in series with SWL of 250 metric tons and 2,5 meter stroke.

The Results:

The structures were successfully installed at 2700 meter water depth from the vessel Deep Blue at Petrobras America Cascade and Chinook gas fields in the Gulf of Mexico. The Cranemaster® units were used as a passive heave compensation system to reduce landing speed on the sea floor. Particular to this project, the Cranemaster® units were deployed through the moon pool of the Deep Blue.