Home / Portfolio / Applications / Removal of 420 metric tons offshore bridge structure
Removal of 420 metric tons offshore bridge structure2018-09-30T22:16:00+00:00

Project Description

Customer Challenge:

Protection of the crane and the structure from shock loads during the removal process of a large offshore bridge structure of 420 metric tons in the North Sea.

Cranemaster Solution:

A Cranemaster® unit with SWL of 600 metric tons and 3 meter stroke.

The Results:

Potential shock loads from bumping into guides and bumpers as well as shock loads due to short “free fall” of the structure were avoided. The operation was carried out by a leading offshore contractor in the global Oil & Gas industry and was completed according to original time and plan.