Home / Portfolio / Industries / Renewables / Pile hammering for E.ON at the Rampion project
Pile hammering for E.ON at the Rampion project2018-07-06T12:11:25+00:00

Project Description

Customer Challenge:

Preventing pile runs during installation of 116 monopiles at the Rampion Offshore Wind Farm Project off the south coast of England.

Cranemaster Solution:

Two Cranemaster® shock absorbers with SWL of 1000 metric tons and 700 metric tons.

The Results:

The two jack-up vessels MPI Discovery and Pacific Orca installed the foundations using a 1000 metric tons crane to lift each foundation upright before lowering and piling it into the seabed using an hydraulic hammer. The installation was completed on schedule.