Load chart with improved load curves

Customer Challenge:

Lifting of a subsea x-mas tree with weights of 37 metric tons from a work boat to  a semi submersible rig offshore New Zealand.

Cranemaster Solution:

A Cranemaster shock absorber with SWL of 100 metric tons and 1 meter stroke.  A load chart with improved load curves was delivered together with the Cranemaster unit.

Back to all references