Home / Portfolio / Applications / Splash Zone Crossing / Jumbo installs structures for Ikhwezi project
Jumbo installs structures for Ikhwezi project2018-09-27T11:28:18+00:00

Project Description

Customer Challenge:

Deployment of five subsea structures for PetroSA’s Ikhwezi project, offshore South Africa.

Cranemaster Solution:

Two Cranemaster® units with SWL of 250 metric tons and 2,5 meter stroke.

The Results:

The installation of the five structures, weighing between 35 and 185 metric tons and measure up to 14 x 8 x 5 ½ meter, was executed by Jumbo’s DP2 Heavy Lift Vessel Fairplayer.

The Cranemaster® units successfully removed the dynamic forces during all phases of the installation process. Cranemaster also carried out lift analysis for the project.