Project Description
Customer Challenge:
Splash zone crossing and reduction in seabed landing velocity during installation of PLEM modules in the South China Sea.
Cranemaster Solution:
A Cranemaster® passive heave compensator with SWL of 150 metric tons and 4,5 meter stroke.
The Results:
Due to the large horizontal area of the PLEM modules, significant improvements in the operational weather window was obtained by use of the Cranemaster® unit. The operation was carried out by a large marine contractor. Cranemaster was used for both splash zone crossing and reduction in seabed landing velocity.