Load chart improvement for lifting of x-mas trees

Customer Challenge:

Lifting of x-mas trees using a Seatrax 108 S10832 crane.

Cranemaster Solution:

Two Cranemaster® shock absorbers with SWL of 100 metric tons and 1 meter stroke in parallel configuration.

The Results:

Report from calculations shows significant improvement in the load chart values.